Home   English   中文
  Home>Project
   
 Projects
  Exhibition
  Others
  Transportation
  Culture and Sports
   
 Construction Scene
  construction scene photos
   
Stadium of Shengyang Olympic Sports Center

getting data..
wait...





As one of the sites for Beijing Olympic Games 2008, the stadium gives expression to "Green, Technology, Humanism" of our Olympic concepts by its design idea. Its over 300-meter long roofing was built with AST roofing system, which looks like a crown with shining crystal - the AST-65 vertical overlocked Al-Mn-Mg alloy roofing panels.

Roofing system:   AST-65 Vertical overlocked Al-Mn-Mg alloy roofing system;
Main materials:   0.9mm Primary color hammered pattern aluminum alloy panel
Main panel shape:   AST-65 straight panel (pre-bent)
Roofing area:   40200㎡

 

 
About Us | Contact Us
copyright @2009 Hangzhou GoPure Building System Co.,Ltd. all rights reserved.
send Email